Solar and batteries
Commercial solar and batteries, Noosa and Sunshine Coast
Solar and battery systems for businesses and organisations from Maroochydore to Kin Kin, including manufacturing, resorts, breweries, schools and aged care. A system on site lowers energy costs and, with a battery, keeps critical operations running through a power outage.

Why businesses install solar and batteries
- Lower energy costs. Most businesses use the bulk of their power during the day, when solar is producing it, so the energy is used as it is generated.
- Return on investment. The proposal sets out the cost, the expected saving and the payback period, calculated from your current energy use.
- Protection from price rises. Energy produced on site is not affected by future changes to energy tariffs.
- Blackout protection. A battery with backup keeps critical operations running when the grid supply is interrupted, such as refrigeration, production, care and IT.
How a commercial project runs
- Energy use. We work from your energy bills or from the usage data recorded by your energy meter.
- Site visit. We inspect the roof, the switchboard and the site, and confirm which operations need backup.
- Proposal. Our energy specialists design the system in-house and provide a written proposal with the equipment, the rebate where it applies, and the return on investment calculation.
- Project management. Commercial systems are larger than residential ones. We manage the project from start to finish, and installation is arranged around the operational needs of the business.
- Installation. Carried out by accredited installers.
- Approvals and paperwork. We handle the STCs where the system qualifies and any network connection approvals required.
- Handover. We explain the system and the monitoring software to the people who will use it.
After installation
If anything goes wrong, one call to our office resolves it. We manage warranty claims with the manufacturer. We also carry out electrical, air conditioning and refrigeration work, so the system can be looked after alongside the rest of the site.
Equipment
Sungrow, GoodWe and Sigenergy inverters and batteries, Enphase microinverters, and Jinko panels.
Example: resort, Coolum Beach
A 49.87 kW rooftop solar system with a 25 kW three-phase Sungrow hybrid inverter and 40 kWh of battery storage, with production and consumption monitoring. Completed in February 2026.

Common questions
What do you need to prepare a proposal?
Recent energy bills or access to your meter's usage data, and the site address.
How do you calculate the return on investment?
From your current energy use, taken from your bills or your meter's usage data. The proposal shows the cost, the expected saving and the payback period.
Can a battery keep our business running in a blackout?
Yes. We confirm which operations need backup and size the battery and inverter to suit.
Will installation disrupt our operations?
Installation is arranged around the operational needs of the business.
Do you handle approvals?
Yes. We handle the STCs where the system qualifies and any network connection approvals required.
Can you look after a system you did not install?
Yes. See solar repairs.
Electrical Contractors Licence 84097 · ARC Licence AU45225 · Refrigerant Handling Licence LO28209 · Master Electricians member · $20 million public liability · 12-month workmanship guarantee · On the Sunshine Coast since 1973
